Electrical Safety Reviews

Last Revision (3/25/2002)

In general all apparatus that installed within the Particle Physics Division must be approved before it is left to operate unattended. The Division Head grants approval in the form of an operational readiness clearance (ORC). The Division Head makes his approval based on input from the Division Senior Safety Officer (SSO). The SSO conducts a review of the apparatus before making recommendation. The following documents provide guidance: