PPD DepartmentsResourcesFermilab at Work

 

Infrastructure Group

The Electrical Engineering Department Infrastructure Group can provide support on "infrastructure" aspects of projects from conceptual design through final implementation. This includes providing guidelines on Electrical Design Standards, Cable Selection, Electrical Safety Reviews, and Networked Design Tools. We also provide direct assistance with AC, DC, and high voltage supply and distribution; equipment cooling, rack protection, cabling; and electronics procurement and fabrication including prototyping, reworking, etc. The conduct of operations information for this group can be found at:  (Infrastructure Group Operations) What follows are links to some useful guidelines along with a list of the direct support that can be provided:

 

Guidelines, Tools & Info

Electrical Design Standards

Cable Selection

Electrical Safety Reviews

Software Tools

PC Boards (Link to CAD Group)

Rack Configuration, Utilities, Protection and Monitoring Systems

EED Server Directory Structure (For EED Members)

Grounding and Shielding Techniques for Large Scale Experiments

 

Infrastructure Assistance

AC Distribution Systems

DC Distribution Systems

High Voltage distribution Systems

Cabling

Obtaining Parts & Outside Services

Electronic Assembly and Prototyping

Reserved

Rack Configuration, Utilities, Protection and Monitoring Systems

 

Who to Contact:
Rick Hance (630) 840-3898 at hance@fnal.gov
Ray Yarema (630) 840-4817 at yarema@fnal.gov

 

last modified 07/06/2005   Comments or Questions?  hance@fnal.gov

 

Security, Privacy, Legal

Fermi National Accelerator Laboratory

PPD Home PagePPD DepartmentsPPD ResourcesFermilab at Work