Meson Test Beam Facility
Pictures
Pictures of walkthrough from M05 to M02 (May 19, 2005)
|
|
|
|
Meson Test Beam Facility in the |
A CDF calorimeter module in the test beam |
|
|
|
|
The control room |
The beam dump for the MTest line |
|
|
|
|
The split of meson beams in the M02 area |
The downstream entrance to the
beamline |
|
|
|
|
A target wheel for secondary or tertiary production |
The 80 foot Cerenkov detector in M04 |
|
|
|
|
One of the single-wire drift chambers |
|
p