Details of beamline and user areas:

 

 

A layout of the Meson Lab, MTest beamline elements and MTest user areas can be found here:

· MTest User Areas Rough Outline  (jpeg, ppt)

· Meson Lab Drawings, (pdf)

· Meson Lab Autocad file (AutoCAD) (IDEAS)

· MTest User Areas with radiation survey data (ps)

· MTest Beamline Elements (pdf)

· All SY120 Beamline Elements (pdf)

· Electrical system at Mtest (pdf)

 

A great link to the Accelerator Division’s Fixed Target and SY120 Operations page

 

A description of the time structure of the beam: (txt)

 

Summary of beam rates July 31, 2007: (doc)

 

Percent noise vs. distance from in-time peak, July 31, 2007 (spreadsheets): 16 Gev, 8 GeV, 4 GeV, 2 GeV, 1 GeV

 

Study of multiple tracks as a function of rate and gate width: (postscript)

 

Tune parameters:

· 120 GeV, recent tune

· 32 GeV tune

· 16 Gev tune

· 8 Gev tune

· 4 Gev tune

· 2 Gev tune

 

Study done with g4beamline (word)

G4Beamline simulation software

 

A spreadsheet has been made by the beamline physicist, Tom Kobilarcik.  Here is the latest version of this spreadsheet and the resulting predicted rates as a function of momentum.  (Excel )

 

MTest beam sheet and data file

 

Safety documents related to the MTest facility are here:

 

· PPD Safety Assessment Document/Readiness Review (doc)

· MTest User Areas Radiation Assessment Calculation  (ps)

· Radiation Shielding Assessment for the MT6 area (doc)

· The MTest beamline was operated in 1999 for test purposes with an 800 GeV primary energy and a description of the operation of that run is in this memo:

 

·      A New MTest Beamline for the 1999 Fixed Target RunT. Kobilarcik, C. Brown    (ps, pdf)

An early outline for operation of MTest with Main Injector beam can be found here:

Main Injector Beam to the New Muon and Meson Areas;T. Kobilarcik   (ps, pdf)