Details of beamline and user areas:
A layout of the Meson Lab, MTest beamline elements and MTest user areas can be found here: · MTest User Areas Rough Outline (jpeg, ppt) · Meson Lab Drawings, (pdf) · Meson Lab Autocad file (AutoCAD) (IDEAS) · MTest User Areas with radiation survey data (ps) · MTest Beamline Elements (pdf) · All SY120 Beamline Elements (pdf) · Electrical system at Mtest (pdf)
A great link to the Accelerator Division’s Fixed Target and SY120 Operations page
A description of the time structure of the beam: (txt)
Summary of beam rates July 31, 2007: (doc)
Percent noise vs. distance from in-time peak, July 31, 2007 (spreadsheets): 16 Gev, 8 GeV, 4 GeV, 2 GeV, 1 GeV
Study of multiple tracks as a function of rate and gate width: (postscript)
Tune parameters: · 32 GeV tune · 16 Gev tune · 8 Gev tune · 4 Gev tune · 2 Gev tune
Study done with g4beamline (word) G4Beamline simulation software
A spreadsheet has been made by the beamline physicist, Tom Kobilarcik. Here is the latest version of this spreadsheet and the resulting predicted rates as a function of momentum. (Excel )
MTest beam sheet and data file
Safety documents related to the MTest facility are here:
· PPD Safety Assessment Document/Readiness Review (doc) · MTest User Areas Radiation Assessment Calculation (ps) · Radiation Shielding Assessment for the MT6 area (doc) · The MTest beamline was operated in 1999 for test purposes with an 800 GeV primary energy and a description of the operation of that run is in this memo:
· A New MTest Beamline for the 1999 Fixed Target RunT. Kobilarcik, C. Brown (ps, pdf) An early outline for operation of MTest with Main Injector beam can be found here: Main Injector Beam to the New Muon and Meson Areas;T. Kobilarcik (ps, pdf)
|